| M01/1 |
Probabilistic Fracture Mechanics
An~lyse of Steam Generator Tube: A Sensitivity Study
Toyokazu Aoki, Yoshihiro Isobe, Shinobu Yoshimura and Genki Yagawa
|
| M01/2 |
Development
of PFM Code for Evaluating Reliability of Pressure
Katsuyuki Shibata, Daisuke Kato and Yinsheng Li |
| M01/3 |
Preliminary
Risk Assessment Associated with IGSCC of BWR Vessel Internals
Arthur Ware, Keith Morton, Michael Nitzel, Tsun-Yung Chang and Nilesh
Chokshi |
| M01/4 |
Probalistic
Fracture Mechanics Analysis of Nuclear Reactor Pressure Vessels: Effects
of Transition from Embedded Crack to Surface Crack
Yasuhiro Kanto and Genki Yagawa |
| M01/5 |
Conditional
Probability of Failure from Impact Loads of the Reactor Shield Shell
Dimitre Stefanov |
| M02/1 |
Seismic
Capacity Evaluation of Heat Exchanger Used in Residual Heat Removal System
for Seismic PSA
Yuichi Watanabe, Tetsukuni Oikawa and Ken Muramatsu |
| M02/2 |
Use of Seismic PSA for NPPs Sited onto Quaternary
Deposits - Phase I: Overall Evaluation Method Considering Seismic Stability
of the Ground
Jiro Hirose, Ken Muramatsu, Tsuyoshi Takada, Toru Masao and Masamitu
Watanabe
|
| M02/3 |
Methodology
for Evaluation of Failure Frequency of ASME Class 2/3 Piping
Ladislav Pecinka and Vladimir Krupa |
| M02/4 |
Seismic
PSA for a Japanese Standard BWR
Masaharu Sakagami and Mitsumasa Hirano |
| M03/1 |
Reduction
of the Seismic Hazard Considering the Incompleteness of the Korean Earthquake
Catalog
Kwan-Hee Yun and Jong-Rim Lee |
| M03/2 |
Study
on Intluence of Uncertain Terms to Seismic Hazard Curves in Probabilistic
Safety Assessment
Kenji Hagio, Takejiro Misumi and Masaharu Sakagami |
| M03/3 |
Estimation
of Historical Earthquake Intensities through Test on Scaled Wooden House
Model
Jeong-Moon Seo, In-Kil Choi, Young-Sun Choun and Jong-Rim Lee |
| M03/4 |
Application
(Test) of Guidelines for Probabilistic Seismic Hazard Analysis
Ernst Zurflueh, Andrew Murphy, Nilesh Chokshi and Jean Savy |
| M03/5 |
A Probabilistic
Evaluation of Design Response Spectra for Nuclear Power Plant Sites in Korea
Myunghyun Noh, Sung-Kyu Lee, Chang-Bock Im, Choul-Ho Yun and MoonSoo
Kim |
| M03/6 |
Seismic Hazard and Prognosis
for Cernavoda NPP Site
V. Serban, M. Androne, C. Mingiuc, I. Rotaru and N.J. Krutzik
|
| M04/1 |
Optimal
Seismic Design Method for Base-Isolated Pool Structure by Minimizing Lite
Cycle Cost
Hyun Moo Koh, Kwan Soon Park and Junho Song |
| M04/2 |
Optimal
Design Base Shear Coefficient on Life-Cycle Cost of a SRC Office Building
Ikuo Katayama, Tadashi Annaka. Mitsuyoshi Tsunekuni and Kohei Ohta |
| M04/3 |
Cost-Effectiveness
Evaluation of Aseismic Design Criteria
Alfredo H-S. Ang and Jae-Chull Lee |
| M04/4 |
Probabilistic
Optimization of Safety Coefficients
Michel Marques. Nicolas Devictor, Flavio De Magistris. Eric Meister
and Jacques Heliot |
| M04/5 |
Simplified
Estimation Method for First Excursion Probability of Secondary System with
Gap
Shigeru Aoki |
| M04/6 |
Directional
& Importance Sampling Methods for Reliability Evaluation of Structures
with Multimode Failure
Adrian Vulpe and Alexandru Carausu |
| M05/1 |
Human
Reliability in Grounding and Collision of Ships
Masaaki Matoba |
| M05/2 |
Use
of Plant Logic Diagram to Aid Operator Actions
Lekha Chowdhury |
| M05/3 |
Development
ofMarkov Model of Emergency Diesel Generator for Dynamic Reliability Analysis
Sun-Yeong Choi, Joon-Eon Yang and Youngho Jin |
| M05/4 |
Markovian
and Semi-Markovian Models for Availability Evaluation of Repairable Subsystems
& Equipment in NPP's
Alexandru Carausu and Adrian Vulpe |
| M05/5 |
Maintenance
Strategies for Degrading Structures in NPP's Based on Time-Dependent Reliability
Models
Adrian Vulpe and Alexanderu Carausu |
| M06/1 |
Risk
Management of Nuclear Power Plant Using Living PSA
Lekha Chowdhury |
| M06/2 |
Regulatory
Experiences of Design Related Mechanical and Structural Risk Analysis on
Recent Korean NPPs
Chang-Ju Lee, Jong-Soo Choi and Yong-Ho Ryu |
| M06/3 |
Risk-Based
Evaluation of the Emergency Power Supply in Nuclear Power Plants
Sven Bohringer and Karl Gotz |
| M06/4 |
Probabilistic
Approaches Supporting Maintenance of Degraded Steam Generator Tubes
Leon Cizelj, Tomaz Dvorsek and Borut Mavko |
| M06/5 |
Calculation
for Risk Informed Inspection and Cost Effective Maintenance Using Probabilistic
Fracture Mechanics
Noriyoshi Maeda, Shinichi Nakagawa, Genki Yagawa and Shinobu Yoshimura |
| M06/6 |
The
Evaluation of Risk Impact for Design Candidates Using PSA Model
Hae-Cheol Oh, Jang-Hwan Na and Seung-Jong Oh |