10th International
Conference on |
|
DIVISION P: PROBABILISTIC SAFETY ASSESSMENT
(The papers with links are those received by the SMiRT 10 Secretariat at the
time the Transactions went to press)
P01: System Reliability Studies
|
Mathematical Methods
for Sequential Operations Reliability |
| Ageing
Phenomenon in Probabilistic Safety Assessment Studies M. Das, R.N. Bhawal |
| Mathematical
Methods in the Qualimetrical Determination of Safety Level of Nuclear Power
Plants Pawl Kuraszkiewicz, S. Altmann |
P02: Dependent Failure Modeling
| The
Concept of Dependence in PSA George E. Apostolakis |
| Stochastic
Reliability Analysis: The Interface for Component Data Evaluation Peter Dörre |
| Interaction
Between Model and Data in Common Cause Failure Analysis Ali Mosleh |
| The
Use of Engineering Judgement in Dependent Failure Analysis G.M. Ballard |
| Review
of Current Problems in Dependent Failure Analysis Stefan Hirschberg |
| On
Models for Causal Dependency Gerath W. Parry |
| On
the Treatment of Dependence in Making Decisions About Risk Vicki M. Bier |
P03: PSA-Based Decision Making
|
Uncertainty
Estimation in Nuclear Power Plant Probabilistic Safety Assessment: State
of the Art and Use in Decision Making |
| Insights
from the German Risk Study in the Light of the Reported Comments on NUREG
1150 Peter Kafka |
| The
Role of Uncertainty in Seismic Risk Analysis Bruce Ellingwood |
| Seismic
Probabilistic Risk Assessment and its Application to Utility Safety Decisions J.-S. Wu, F.L. Yu, P.C. Chen, E. Lin |
P04: Application of Probabilistic Methods
|
An Expert
System to Estimate Time, Rate and Magnitude of Release of Important Radioactive
Isotopes, Given a Loss of Containment Integrity |
| An
Estimation of the Probability of Failure for BWR-Piping in Sweden Fred Nilsson, Björn Brickstad |
| Deductive
Tree Analysis for Evaluating the Reliability of Construction Operations Ziad A. Eldukair, Bilal M. Ayyub |
| PSA
of Subsystem of Nuclear Power Plant Based on Analysis of Possible Distortions
and Failures Pawel Kuraszkiewicz |
P05: Managing the Risks of Relay Chatter and Other Seismic Effects
| Enhanced
Seismic Risk Assessment on the Diablo Canyon Power Plant Dennis C. Bley, Harold F. Perla, Donald J. Wakefield, Bruce D. Smith |
| Seismic
Risk Management of the Beznau Nuclear Plant Harold F. Perla, Suresh Sahgal |
| Relay
Chatter and its Effects on Nuclear Plant Safety Howard E. Lambert Robert J. Budnitz |
| Analysis
of Relay Chatter in the Diablo Canyon PRA Dennis C. Bley, Bruce D. Smith |
| Seismic
Evaluation of Relays for the Plant Hatch Seismic Margin Assessment Keith D. Wooten, James E. Smith, Donald P. Moore, Robert P. Kassawara |
P06: Seismic PSA
Return to SMiRT 10 TOC